HUMAN CREMATION CASE STUDIES

Woodland Cemetery in Sweden

Woodland case study

Matthews built and installed a four-incinerator facility at Woodland Cemetery in Stockholm with a flue gas cleaning system. Featuring 1.1m front doors, rear-side ash discharge, an integrated ash cooling system, and an automatic coffin loader, these cremators are capable of 24-hour operation, and are used for 6-7 cremations daily. The system features a unique flue gas chimney booster, as well as a water-cooled circuit for heating and cooling the building. The facility was completed in 2012 and is compliant with all relevant European environmental regulations.

INSTALLATION

  • Sweden, Stockholm – Woodland Cemetery Listed as Unesco World Heritage

CREMATIONS PER DAY

  • 6-7 Cremations, per day each CRM unit

EMISSIONS

  • In compliance with the European Standards and Regulations in the country of installation.

SCOPE OF PROJECT

  • CRM 6R
  • High-performance cremator = H24 working process
  • Front door opening = 1100mm
  • Ash discharge = rear-side
  • Integrated ash cooling system
  • Automatic coffin insertion system with lifting truck
  • Flue gas cleaning with reagent injection system
  • Water circuit for heating and cooling building
  • Unique booster solution for flue gas chimney 250 meters far away from cremators building